Freelance Lean Manufacturing Six Sigma Southwell
A highly motivated professional with extensive experience in management, manufacturing, lean manufacturing (Japanese Sensei trained), quality and engineering environments. Proven ability in improving key performance indicators, managing people, best practice and managing the resultant change. Main career has been with Kodak Ltd and working within a global matrix organisation.
| Rating: | Unrated (New) |
| Hourly Rate / Cost: | |
| Available From: | |
| Seller ID: | 280292 |
CV
PROFILE
A highly motivated professional with extensive experience in management, manufacturing, lean manufacturing (Japanese Sensei trained), quality and engineering environments. Proven ability in improving key performance indicators, managing people, best practice and managing the resultant change. Main career has been with Kodak Ltd and working within a global matrix organisation.
KEY SKILLS & COMPETENCIES
|
|
CAREER
January 2006 to August 2006 Lean Consultant
Working with a print manufacturing company to train personnel at all levels on Lean Manufacturing principles and techniques plus implementation of key projects with shop floor improvement teams. Six Sigma training/implementation launched where escaping defects were recorded.
Key Achievements
· Zero defects policy implemented on key lines
· Lean training modules successfully delivered to customer requirements
· Targeted improvements successfully implemented
May 2005 to October 2005 - Site Manager (Annesley Site and European Pack
Centre in Mansfield)
Eastman Kodak is a worldwide organisation with 64,000 employees and sales of $13.3 billion in 2003. The site employed 450 people and supplied consumer and professional finished products throughout Europe.
Key Achievements
· Planned and implemented detailed closure plans for two sites; including people exit program
· Both sites closed on time, within budget and personnel managed without
major incidents
2003 to 2005 Quality Manager - Kodak Limited
In 2003, The Kodak Limited Annesley site recorded the worst quality
performance in any of the worldwide sites mainly due to the high level of
external customer complaints. As a Black Belt, I was appointed into the
Quality Managers position to reverse the trend and work with Quality
Technicians & Engineering to improve our performance.
Key Achievements
· Zero defect mentality implemented (site wide that became a Worldwide program)
· No defects recorded in last two years of operation
· Major change in attitude and approach towards resolving problems
2002 to 2003 Manufacturing Excellence Manager - Kodak Limited
A position created to implemented a six sigma and lean strategy plus work
along side manufacturing in order to improve their performance (Key
Performance Indicators).
Key Achievements
· Significant improvement achieved in manufacturing performance
· Ground work commenced on developing a six sigma program of improvement
· Kaizen activity rapidly increased and training with Japanese Sensei
continued
1998 to 2002 High Volume Production Manager - Kodak Limited
In 1997, a large number of high volume manufacturing machines were
transferred to the Kodak Limited Annesley site. These were in a poor
condition and performed well below par. The initial layout of the lines
was not using lean thinking methodology. I was appointed into this
position in to improve the line performances and work with the production
teams to develop cellular working (self managing teams).
Key Achievements
· Overall Equipment Efficiency (OEE) raised from 25% to 85% and sustained
· Order performance raised to over 96%
· Self managing teams implemented and layers of management removed
· Cellular line layout implemented, mainly through kaizen activities.
· First Heijunka planning system implemented
1992 to 1998 Engineering Management - Kodak Limited
Various positions held within the engineering department with specific
responsibility to improve the level of service, implementation of
standard work practises, modular maintenance programs, performance
equipment monitoring, craft skills analysis and service level agreements.
Key Achievements
· Modular maintenance programs implemented across site
· Condition monitoring systems introduced
· Craft skills analysed and training programs introduced
· Perfmance monitoring systems devised and implemented
Skills & Qualifications
· EITB Engineering Apprenticeship (6 year program)
· Lean Practitioner (trained by ex Toyota Japanese Sensei)
· Fully Qualified Black Belt with proven track record of improvement
· Business System Auditor (including IIP)
· Qualified Safetrack Auditor
· C&G Mechanical Engineering + C&G Plastic Technologist
· Manchester Business School education program
Personal Information & Interests
Categories & Freelance Skills
Engineering & Technical
Categories
Skills
- Equipment Maintenance (Engineering - Experience)
- Japanese (Engineering - Languages)
- Kaizen (Engineering - Experience)
- Languages (Engineering)
- LEAN (Engineering - Experience)
- Management (Engineering - Experience - Quality)
- Manufacturing (Engineering - Experience)
- Mechanical Engineering (Engineering - Experience)
- Quality (Engineering - Experience)
- Quality Manager (Engineering - Job Role)

