Freelance Piping Engineer Deeside
Piping Engineer
Worked in the capacity as Construction Engineer, Piping Engineer, Structural Engineer, Planning Engineer, Superintendent, Field Engineer, Piping Checker & Senior Piping Designer.
I have worked on Refineries, Petrochemicals, Polymer Plant, Glass Fibre Plant, Latex Plant & Paper mill.
Oil platforms, both onshore & offshore, North Sea, Arabian Gulf, South Korea and also FPSO's.
Worked as a member of Project Management Teams.
Piping design from conceptual studies, front-end design, through to final completion of the projects, in house
One project I worked in capacity of Deconstruction Engineer, when a complete refinery was taken down and transported by river to Rotterdam for onward passage to India for reconstruction.
On projects in the Gulf, I was required to estimate and produce full task sheets, together with planning bar charts and histograms for mechanical, piping, structural, architectural and HVAC. Both Gulf projects were completed on budget and on time.
| Rating: | Unrated (New) |
| Hourly Rate / Cost: | |
| Available From: | |
| Seller ID: | 298148 |
CV
Brief Career Summary
Worked in the capacity as Construction Engineer, Piping Engineer, Structural Engineer, Planning Engineer, Superintendent, Field Engineer, Piping Checker & Senior Piping Designer.
I have worked on Refineries, Petrochemicals, Polymer Plant, Glass Fibre Plant, Latex Plant & Paper mill.
Oil platforms, both onshore & offshore, North Sea, Arabian Gulf, South Korea and also FPSO's.
Worked as a member of Project Management Teams.
Piping design from conceptual studies, front-end design, through to final completion of the projects, in house
One project I worked in capacity of Deconstruction Engineer, when a complete refinery was taken down and transported by river to Rotterdam for onward passage to India for reconstruction.
On projects in the Gulf, I was required to estimate and produce full task sheets, together with planning bar charts and histograms for mechanical, piping, structural, architectural and HVAC. Both Gulf projects were completed on budget and on time.
Qualifications: ONC & HNC Mech. Eng.
SENIOR PIPING DESIGNER/CHECKER
(DESIGN and CONSTRUCTION)
Education:Prenton Secondary School
GCE: Maths
English Language
Physics
Qualifications:ONC.Mech.' Engineering
Birkenhead Technical College.
HNC. Mech.' Engineering
Brighton College of Technology.
Computer Literate.
Career Summary:Mechanical & Piping Design / Construction / Field
Engineering / Estimating/Planning / Supervisionon
Oil Refineries, Oil and Gas OffshorePlatforms and
Petro / Chemical Installations, both home and adroad.
The following work experience was based on the last 27 years. Further information on previous employment will be sent on if required.
MIRO (1) REFINERY. (KARLSRUHE, GERMANY) May 2002-November 2002
Senior Piping Designer/ Field Engineer (Based in agency office, then on site)
Miro (1) Shutdown
Carried out and produced site studies for basic pipe routing to/from new equipment, locate and verify tie-in points. Full check out of all proposed pipe changes to new P&I's. Work passed over to be put on computer operators to upgrade.
In the field, required to oversee installation and to handle problems that occur with site or design changes
DOW CHEMICAL. (RHEINMUNSTER, GERMANY) November 2001-February 2002
Senior Piping Designer/Engineer (based in agency office & on site)
Latex cooling water system up-grade
Surveys were carried out and studies were produced for a three (3) phase installation. Tie-in points determined, tie-in ISO's, fabrication ISO's together with overall layouts were produced. The three (3) phase installation was a requirement to give minimum shutdown of the latex plant itself. Liased with client and fabricator on all aspects of the project to present over all package
--------------------------
MIRO (1) REFINERY. (KARLSRUHE, GERMANY) July 2001-November 2001
Field Engineer/Piping Designer (based in agency office & on site)
Miro (1) Blow-down System
Responsible to survey and locate all SV's (safety valves), within the three extensive blow-down systems. These where required allowing stress engineers to make a more accurate stress calculation of each system. Over 450 isometrics together with complete set of marked up GA's were produced. Also, when transferred to the new CAD layout, simplified operators ease for location in the field and
system
-------------------------
MIRO (2) REFINERY. (KARLSRUHE, GERMANY) February 2001-July 2001
Field Engineer/ Senior Piping Designer (Based on site)
Miro (2) Shutdown
Responsible for site surveys, producing tie-in ISO's, fabrication ISO's for new pipework to/from new and relocated vessels/equipment. Also required to incorporate design changes, update P & ID's and final yellow line checks.
--------------------------
MOBIL REFINERY. (KARLSRUHE, GERMANY)February 2000-January 2001
Deconstruction Engineer
Cuddalore Refinery Project
Work entailed supervision throughout deconstruction together with preparation of full engineering packages for the reconstruction in India.
AKER OFFSHORE PARTNERS. (STAVANGER; NORWAY) October 1998-January 1999
Sub-contracted to AKER Stavanger to carry out checking programme on CAD produced ISO's and supports 'Eldfisk Project, 2/7E' being fabricated and assembled at AkerMaritime, Stord Verft.
AKER MARITIME. (STORD VERFT, NORWAY) March 1998-October 1998
Senior Piping Designer/Materials Co-ordinator
Project: Åsgard 'A', Floating Production, Storage & Offloading Vessel (FPSO)
Position entailed material co-ordination of carry over work from Japan, together with material requirement for piping job packs & site instructions towards final hook-up. Later seconded to commissioning to handle engineering problems that occur through the pre & commissioning period.
-------------------------
SHELL (Ellesmere Port) FOSTER WHEELER ALLIANCE. September 1997-February 1998
Senior Piping Designer/Field Engineer
Various Projects including, upgrading of plant, major/small shutdowns etc. Working in close unison with process engineers to produce full engineering packages including P & ID's, G.A's, ISO's, and MTO's in accordance with SHELL BDEP's
-------------------------
J.R.STANSFIELD & ASSOCIATES (Risley, Manchester)May 1997- September 1997
Senior Piping Designer/Field Engineer
Work entailed site surveys, design studies, fabrication ISO's and MTO's. Co-ordinating throughout construction, on the installation of equipment and all the pipework, for British Gypsum Plant in Runcorn, Cheshire.
-------------------------
BRIDGEWATER PAPERMILL. (Ellesmere Port)October 1996-March 1997
Senior Piping/Mech. Designer
Work entailed, site survey, re-design of refiner room set up. To produce GA's and working drawings for sub-contractors to install pumps, standpipes, motors refiners units together with all relevant pipework. To revamp to existing systems and modifications to pulp chests creating and increase to the stock capacity of the paper mill. Work being carried out to papermill industries specifications.
--------------------------
PREUSSAG STAHL. (GERMANY)June 1996-October 1996
Piping Engineer/ Designer
Linde AG. LZA. Project: Installation of Oxygen Plant
Work entailed, producing fabrication drawings for all pipework on site, including tie-ins for shut down, pumping arrangements, exchangers, absorbers and oxygen producing cold box. Also responsible for design work carried out on site, site survey and engineering back-up to construction. Lastly, preparing final engineering documentation, which included as builts, to pre-commissioning stage.
MOWLEM ENGINEERING (Bromborough) September 1995-November 1995
Senior Piping Designer
Project: SO2 Vent Header, Unit 3000. SHELL Refinery, Stanlow
Work entailed, site survey, design studies through to final engineering drawings (GA's, ISO's & MTO's) All targets met.
-------------------------
COSTAIN OIL/GAS & PROCESS LTD. (Stanlow)January 1993-January 1994
Piping Designer/Checker
Project: Dope Acid Plant. SHELL Refinery, Stanlow.
Checking GA's and isometric drawing produced on P.D.M.S.system. Producing support details carrying out piping studies for pumps, exchangers and reactors and other equipment.
-------------------------
LINDE AG. (MUNICH, GERMANY) August 1992-December 1992 Senior Piping Designer
Project: Olefins Plant, ANTWERP (BASF)
Producing working studies and ISO's for oven area (12 ovens). Instructing model makers with regard to working changes etc. and producing required engineering paperwork for construction. (ISO's & MTO's)
-------------------------
JACOBS ENGINEERING. (CORK, EIRE)June 1992-August 1992
Piping Designer
Project: Carra Plant
Producing working GA's of small pharmaceutical plant to produce ISO's
--------------------------
LINDE AG. (EL TABLAZO, VENEZUELA) July 1991-June 1992
Senior Piping Designer/ Field Engineer
O2 Olefins Plant, VENEZEULA
Initially went out with a small team, to do a yellow line check. Afterwards proceeded onto field
queries for piping systems together with supports throughout new olefins plant. Finally in charge of team of workers, doing final checks and re-instatement on all systems to commissioning stage.
-------------------------
LINDE AG. (MUNICH, GERMANY) August 1990-June 1991
Senior Piping Designer
Scholven Project (VEBA OEL)
Preparing piping conceptual studies for new Olefin IV plant covering piping/equipment in furnace areas and associated pipe racks. Producing final engineering drawings and paperwork with association to the construction. Liaison with model maker, to produce scaled model.
DOW CHEMICALS. (RHEINMUNSTER, GERMANY) April 1990-August 1990
Piping Designer/Field Engineer
Project: Latex Rubber Plant
Preparing conceptual studies right through to final GA's. Also part of a team, supplying full engineering back-up for shutdown which included re-vamp and extension to the ex'. Latex plant.
--------------------------
COSTAIN ENGINEERING. ( Stanlow) September 1989-April 1990
Senior Piping Designer
Project: Ethynol Benzene Plant. SHELL Refinery, Stanlow.
Preparing GA's for off plots piping/routing together with tie-ins, throughout Shell Stanlow complex in connection with new Ethynol Plant.
-------------------------
AKER ENGINEERING A/S. (TJUVHOLEM, OSLO) June1989-August 1989
Senior Piping Designer/Checker
Snorre Platform Project.
Short contract to assist with GA and ISO check, including stress ISO's in preparation for fabrication in yards throughout Norway.
-------------------------
WIMPEY OFFSHORE. (Aberdeen) March 1989-June 1989
Senior Piping Designer
Project: Leman 'Bravo' and 'Charlie' Platforms. (SHELL)
Producing piping GA's and ISO's together with tie-ins for platform re-vamp this also included
systems composite ISO's for new accommodation on Shell's Leman 'BD' and 'CD' gas platform,
North Sea, Southern Sector.
--------------------------
LINDE AG. (MONGSTAD, NORWAY) August 1988-February 1989
Senior Piping Designer/Field Engineer
Project: Mongstad Refinery Shutdown.
Responsible for handling engineering /piping problems and initiating modifications throughout the
shutdown and re-vamp period. Supplying engineering backup to field supervisors for the duration.
-------------------------
COSTAIN PETROCARBON. (Stanlow) October 1987-August 1988
Senior Piping Designer
Project: Cracker II/Gastails and HF Alkylation. SHELL Refinery, Stanlow.
Preparing GA's and ISO's for off plots pipe routing/tie-ins, throughout Shell Stanlow complex in
connection with Cracker II/Gastails, together with new HF Alkylation Complex.
UK. CONSTRUCTION. (Stanlow) August 1987-October 1987
Construction Engineer
Project: Cracker II Construction. SHELL Refinery, Stanlow
Institute work within planning programme of construction in the field, handling construction and design problems that occurred, on site, during the construction stage on new Cracker Unit 11.
-------------------------
CAPES (AGENCY) Lymm, Cheshire April 1987-August 1987 Piping Designer
Project: Mongstad Refinery.
Preparing ISO's with MTO's from GA's for fabrication of pipework, process area on the MONGSTAD refinery project in Norway. Then over site in Norway to complete work.
-------------------------
WHITE YOUNG PROJECT ENG. (Runcorn) November 1986-January 1987
Piping Designer/Checker
Project: Caustic Neutralisation Plant
Check on original GA's from SHELL. Preparing ISO's and full MTO's from the same.
-------------------------
MOWLEM ENGINEERING. (Bromborough) September 1986-November 1986
Piping Designer/Checker
Initiating GA and ISO check together with overall MTO for various Petro/Chem Projects (Dow Corning, Deenox, Warwick International also MTO for FBC Widnes Plant 'PROCHLORAZ')
--------------------------
WARD BLENKINSOP. (Halebank,Widnes) July 1986-September 1986
Piping Designer
Project: Utilities Upgrade
Preparing conceptual study for installation of new utilities ring mains, which also included the upgrade of existing utilities, in a three phase development programme.
-------------------------
AKER VERFT. (STORD, NORWAY) August 1985-May 1986
Piping Field Engineer/Mechanical Engineer
Project: Gullfaks 'A' Platform
At Shore Stage: Member or a team punching to pre-hydrotesting conditions with after test re-instatement. Work carried over to commissioning stage.
January; In Shore Stage: Responsible for mechanical completion of the platform through up until tow out date to the North Sea in May.
NORWEGIAN CONTRACTORS. (OSLO, NORWAY) January1984-August 1985
Senior Piping Designer/Checker
Project: Oseberg 'A' Platform
Producing conceptual studies and basic engineering for 'Condeep' concrete platform, CMO and MMO. Producing and checking piping arrangements to final engineering completion, including ISO's, MTO's and stress isometrics.
-------------------------
E.T.P.M. (SHARJAH, UNITED ARAB EMIRATES) June 1982-January 1984
Construction Engineer
Project: UMM Shaif Platform (JV. NPCC-ETPM/French Construction Company)
Onshore: Responsible for setting up engineering construction programmes for piping, structural, mechanical, H.V.A.C. and architectural manpower estimation, for onshore phase. Preparation of all estimates, including consumables, together with all above discipline task sheets for offshore phase. Preparing test procedures & offshore planning charts together with manpower histograms.
Offshore:Superintendent and Principal Construction Engineer; responsible for the jobs of 238 persons, all disciplines and for all Contractual and Client Liaison on the installation of new accommodation platform and the re-vamp to existing complex. The work covered hook-up, pre & final commissioning, final acceptance testing and the hand over of the platform. (The completion of the platform was a success, being installed to time and to budget)
E.T.P.M.-DUBAI PETROLEUM COMPANY (DPC).CONOCO
Project: October Shutdown 'Fateh Field'
Onshore:Responsibilities as per 'UMM Shaif', with exception of the preparation of planning charts. Project with 3 months pre-engineering, prior to going offshore for a 7 day shut down.
Offshore:Overall Engineer in charge of shut down, over 4 superintendents, 608 persons and three lifting barges. Work included reinforcement of the platform in the areas of work prior to installation of new 450 ton H.P. separator, removal of existing and replacement of new 150 ton L.P. separator together with all relevant piping. (The project was completed successfully and on time and to budget).
-------------------------
SIRTE (ESSO) OIL COMPANY.(LIBYA) October 1981- June 1982
Senior Piping Designer/Checker
Project: Rhaguba and Zelton pipe line and shore based refinery
Preparing studies and design layouts for pipeline modifications, piping arrangements and refinery
modifications associated with pipeline. Also piping checks GA's and ISO's for ovens within refinery.
-------------------------
BRUNEI SHELL PETROLEUM CO. (SOUTH KOREA) April 1981-October 1981
Senior Piping Designer /Checker
Project: 7- jackets and 5-topsides for Champion 7 Field, Brunei
Checking piping GA's and ISO's against updated P & ID's and Flowsheets for issue to fabrication shops. Instructing Nationals in procedure for draughting GA's, flowsheets and ISO's etc.
PHILLIPS PETROLEUM CO. (STAVANGER, NORWAY) September 1980-April 1981
Senior Piping Designer
Project: Ekofisk & Eldofisk Platforms
Offshore surveys for onshore design and modification for various small projects. Also surveying and preparing exploded diagrams of main systems for individual platforms, in order to produce operator training manuals
-------------------------
O.I.S. (NYMO) KRISTIANSAND, NORWAY. April 1980-September 1980
Senior Piping Designer
Project: Phillips Ekofisk Booster Platforms
Offshore survey and onshore design of piping for fire protection and utilities, within new additional accommodation modules, for booster platforms 36/22 and 37/4. Fabricated in yard.
-------------------------
MOBIL OIL COMPANY. (BERGEN, NORWAY) December 1977-December 1979
Senior Piping Designer/ Field Engineer
Project: Mobil Statfjord 'A' Platform
Offshore:Member of project task force based offshore from construction stage through to production. Responsible for solution of problems, during construction hook-up phase and design modifications up to start of production.
-------------------------
STAVANGER ENGINEERING LINKS. (NORWAY) November 1976-July 1977
Planning Engineer
Project: T.P.I. Gas Platform. Frigg Field.
Offshore:Responsible for planning and monitoring of all workloads during hook-up, construction phase. Attending weekly progress meetings with clients on all planning aspects. Also estimating workload and updating planning charts with regard to design modifications, carried out offshore and outside the original planning scope.
-------------------------
CRAWFORD & RUSSELL (THE HAGUE, HOLLAND) August 1976-November 1976
Senior Piping Designer & July 1977- December 1977
Project ICI Polymer Plant, Rotterdam
Preparing piping layouts, piping GA's and ISO's from flowsheets. Instructing model maker.
-------------------------
PHILLIPS PETROLEUM CO. (Teeside) October 1975-July 1976
Piping Designer
Project: Ekofisk/Teeside Oil Stabilisation Plant.
On site surveys of cracker streams, checking construction progress and modifying piping ISO's and GA's accordingly.
Categories & Freelance Skills
Engineering & Technical
Categories
- Building & Construction (Construction)
- Civil & Structural (Construction)
- Construction
- Energy
- Engineering
- Infrastructure
- Oil & Gas (Energy)
- Water (Infrastructure)
Skills
- Chemical (Construction - Civil & Structural - Experience)
- Chemical (Energy - Oil & Gas - Experience)
- Commissioning (Construction - Building & Construction - Experience)
- Commissioning (Energy - Oil & Gas - Experience)
- Conceptual Design (Engineering - Experience)
- Concrete (Construction - Civil & Structural - Experience)
- Concrete (Energy - Oil & Gas - Experience)
- Construction (Engineering - Experience)
- Construction (Energy - Oil & Gas - Experience)
- Construction Engineer (Engineering - Job Role)
- Construction Engineer (Energy - Oil & Gas - Job Role)
- Construction Planning (Construction - Building & Construction - Experience)
- Design (Construction - Building & Construction - Experience - Project Management)
- Design (Construction - Civil & Structural - Experience - Project Management)
- Design (Infrastructure - Water - Experience - Project Management)
- Design (Engineering - Experience - Project Management)
- Design (Engineering - Experience - Piping)
- Design (Energy - Oil & Gas - Experience - Project Management)
- Draughting (Engineering - Experience)
- Engineer (Construction - Building & Construction - Job Role)
- Engineering Design (Energy - Oil & Gas - Experience)
- Equipment (Energy - Oil & Gas - Experience)
- Equipment Installation (Construction - Civil & Structural - Experience)
- Equipment Installation (Engineering - Experience)
- Estimate (Construction - Building & Construction - Software Skills)
- Estimating/Proposals (Construction - Building & Construction - Experience)
- Fabrication (Engineering - Experience)
- Field Engineer (Energy - Oil & Gas - Job Role)
- Installation (Energy - Oil & Gas - Experience - Equipment)
- Installation (Energy - Oil & Gas - Experience)
- Languages (Construction - Building & Construction)
- Languages (Construction - Civil & Structural)
- Languages (Engineering)
- Languages (Energy - Oil & Gas)
- Mechanical Engineer (Construction - Building & Construction - Job Role)
- Mechanical Engineer (Construction - Civil & Structural - Job Role)
- Mechanical Engineer (Infrastructure - Water - Job Role)
- Mechanical Engineer (Engineering - Job Role)
- Mechanical Engineer (Energy - Oil & Gas - Job Role)
- Mechanical Project Engineer (Engineering - Job Role)
- Norwegian (Construction - Building & Construction - Languages)
- Norwegian (Construction - Civil & Structural - Languages)
- Norwegian (Engineering - Languages)
- Norwegian (Energy - Oil & Gas - Languages)
- Offshore (Construction - Civil & Structural - Experience)
- Offshore (Energy - Oil & Gas - Experience)
- Onshore (Construction - Civil & Structural - Experience)
- Onshore (Energy - Oil & Gas - Experience)
- Petro-chemical (Construction - Civil & Structural - Experience)
- Petro-chemical (Energy - Oil & Gas - Experience)
- Petrochemicals (Engineering - Experience)
- Piping (Engineering - Experience)
- Piping Designer (Infrastructure - Water - Job Role)
- Piping Designer (Engineering - Job Role)
- Piping Designer (Energy - Oil & Gas - Job Role)
- Piping Engineer (Energy - Oil & Gas - Job Role)
- Planning Engineer (Engineering - Job Role)
- Planning Engineer (Energy - Oil & Gas - Job Role)
- Planning Supervision (Construction - Building & Construction - Experience)
- Principal Engineer (Engineering - Job Role)
- Project Engineer (Construction - Building & Construction - Job Role)
- Project Engineer (Construction - Civil & Structural - Job Role)
- Project Engineer (Engineering - Job Role)
- Project Engineer (Energy - Oil & Gas - Job Role)
- Project Management (Construction - Building & Construction - Experience)
- Project Management (Construction - Civil & Structural - Experience)
- Project Management (Infrastructure - Water - Experience)
- Project Management (Engineering - Experience)
- Project Management (Energy - Oil & Gas - Experience)
- Refinery (Engineering - Experience)
- Senior Engineer (Construction - Building & Construction - Job Role)
- Senior Engineer (Construction - Civil & Structural - Job Role)
- Senior Engineer (Energy - Oil & Gas - Job Role)
- Senior Piping Designer (Engineering - Job Role)
- Site Engineer (Construction - Building & Construction - Job Role)
- Site Engineer (Construction - Civil & Structural - Job Role)
- Site Engineer (Energy - Oil & Gas - Job Role)
- Site Surveys (Infrastructure - Water - Experience)
- Site Surveys (Engineering - Experience)
- Site Surveys (Energy - Oil & Gas - Experience)
- Software Skills (Construction - Building & Construction)
- Structural Engineer (Construction - Civil & Structural - Job Role)
- Structural Engineer (Engineering - Job Role)
- Structural Engineer (Energy - Oil & Gas - Job Role)